Our Work Ethics

 
 

CREDIT POLICY:

Our cash policy requires that our esteemed customers make an initial commitment of 90% to mobilize and assemble all hi-tech materials and equipment needed for the job and the outstanding balance of 10% should to be paid before or on completion of work.
NB: We do not accept cash! All payment or transactions are made via electronic transfer (TT, NEFT or ATM etc.), or bank despot, and payment receipt to be submitted in the office or email to: info@westcotgulf.com.
 We recommend payment receipts to be sent to our office as soft copy via email, and we correspond to you in same manner.
(No paper copies: Lets safe the planet! Let stop falling of trees). See Our Banking Details as follows!
ACCOUNT NAME:WESTCOT-GULF INTEGRATED SOLUTIONS NIGERIA LIMITED
BANKS NAME:Standard Chartered BankGuarantee Trust BankFirst Bank Nig. PLCUnited Bank of Africa
LOCAL ACCOUNT NGN: 000  1809  022 014   9535   7382033  523 0441018 274 474
FOREX ACCOUNT $:000 180 9039USD($): NILUSD($): NILUSD($): NIL

PROJECT LIFE CYCLE:
From site survey, parameter analysis, project design, deployment and implementation, these define our job duration, which varies depending on the work scope, project size, and location.Customers can contact our technical team for inquiry, and first to table the need for their security system requirements.

 

To this end WESTCOT-GULF can arrange a site visit, for inspection, and parameter array, and develop a blue print to best suit the customer’s requirement, and offer input for security options and an installation schedule.
Our installations and maintenance projects are highly customers friendly, well planned from Site Inspection, Technical Design, Analysis, and down to Implementation, to minimize security risks, and focuses on cost efficient delivery with the least possible disruption to the customers operations.All our installations are carried out by WESTCOT-GULF certified installers and a Hi-Tec Supervision by our affiliated Original Equipment Manufacturers. The final phases are. . Test-Running, Training of personals and Commissioning

 

Phase-1: Design & Analysis: Start – Start
  1. Site Survey, Parameter Calibrations, Route Assessment     = Days
  2. Design, Importation & Assembling of Hi-Tech Materials      = Days
  3. Technical Assessment, Technical and Cross Checking          = Days
  4. Civil and Piping Network, Conducting and Pipe Laying        = Days

Phase-2: Deployment & Implementation: Start – Start
  1. Parameter Readings, Site Design and Calibrations        = Days
  2. Cabling and Cable Network Routing                                     = Days
  3. Installations, Fittings, Programming, Streaming                  = Days
  4. Test-Running, Training of personals and Commissioning   = Day

 

 

Quote Validity:
Our job quotations remain valid within a period of 10-Working Days from the date of submission.

 
 
 
 